LOCKPORT IL-7 CHANNELIZATION

  • Home
  • About the project
  • Construction Updates
  • Stay Connected
  • Home
  • About the project
  • Construction Updates
  • Stay Connected

Project Backround

About the Project

The City of Lockport is activating the Illinois Route 7 Channelization project to decrease traffic congestion, increase safety and maximize corridor connectivity.

​Currently, this area includes a two-lane road with shoulders, resulting in traffic backups from frequent left turns across traffic. The project will include installing a multidirectional turn lane to improve safety and traffic flow throughout the corridor
Picture

Construction Map

Picture
Download the map here.
  • Click on the image above to view the large-size PDF document of the proposed improvements. Or download the document by clicking on the button above.

Cross Section Details

Picture
  • Typical Section West of 7th Street.

Picture
  • Typical Section East of 7th Street.

This project will provide comprehensive improvements along IL 7 (9th Street) from Lincoln Street to Summit Drive. Some key components include:

Picture

Drainage Upgrades


  • Culvert Replacement
  • Ditch Enclosure
  • Water Main Replacement
  • Storm Sewer Replacement​
Picture

Mobility Enhancements


  • Roadway Widening
  • Traffic Signal Replacement
  • Pedestrian Crossing Improvements
  • Sidewalk Replacement
  • Bus Depot Improvements

Project Area

Picture

Map Note: Project limits are from Lincoln Street to Summit Drive in Lockport, IL

Contact Information

Picture
Christopher B. Burke Engineering, Ltd.
Dan Schroeder, PE
Phone: (224) 315-0185
​Email: [email protected]
Picture
Picture
City of Lockport
Phone: (815) 838-0549
Monday – Friday 7:00am – 3:30pm
​CityofLockport.net
© Copyright 2025 City of Lockport, Illinois
Proudly powered by Weebly